YOKOGAWA AIP521 Control Bus Coupler In Stock Ready to Ship 100% Brand New

SKU: AIP521

Technical specifications

  • Manufacturer: YOKOGAWA

  • Condition:New with Original Package

  • Product Type: Control Bus Coupler

  • Country of Origin: Japan

  • Payment:T/T, Western Union

  • Shipping port: Xiamen

  • Warranty: 12 months

By submitting a request for this item, you confirm that you have reviewed and accepted our Terms & Conditions. Please note that all transactions will be processed offline.

100% Original and Authentic
100% Brand New, Ready to ship
Support Refund, 7X24h Service
1-Year Warranty on All Products

Help us reach more people! Share this product with your network and show your support!

Product Description

The Yokogawa AIP521 is a critical component for Yokogawa's CENTUM VP Distributed Control System (DCS). It acts as a bridge between the central control unit and various instruments within the system.

  • Connects instruments to the control system's communication bus.
    Enables data exchange between field devices and the central controller.


Technical Specifications:

  • Bus Interface: Likely proprietary Yokogawa bus (refer to datasheet for confirmation)
  • Supported Devices: Connects instruments compatible with CENTUM VP DCS
  • Power Supply: Voltage and current requirements unknown (refer to datasheet)
  • Operating Temperature: Likely within industrial standard range (check datasheet for specifics)
  • LED Indicators: May have LEDs for status indication (refer to datasheet for details

 

Other Attributes

  • Country of Origin: Japan/Singapore
  • Lead Time: In Stock, 2 Working Days

 

In Stock Hot Items of YOKOGAWA

ANB10D-425/CU2N SDV144-S63 SAI143-S53
AAI143-H50/K4A00 ALE111-S50 SCP451-51
EC402-50 S1 CP471-00 SPW482-53
AAI143-H50 SCP461-51 CP461-10 S1
SAI143-H63 CP461-10 CP461-50 S2
AAI143-H50/A4S00 SAI533-H53 ACG10S-F2121 S4
ANB10D-420 SNT401-53 AIP826-2 S2
AFF50D-H41201 ADV161-P50 CP451-10
AAV144-S50 SEC402-51 CP451-11
AAI143-S53 ANB10D-420/CU2N/NDEL CP461
ANB10D-421/CU2N/NDEL SAI143-H53 CP461-50
ADV151-P53 AAI543-H53 DP97-B
PW484-50 CP451-50 YNT512D-Q12
CP345 AAI143-H53 ANB10D-410/S2
AAB841-S50 ANB10D-420 S2 NFCP100-S00
NFAF135-S50 CP461-51 CP451-10 S2
NFAI141-S00 SCP461-51 S1 SAI143-H33
NFAI141-S50 SCP461-51 S2 SAI143-H03
NFAI841-S50 SNB10D-225/CU2T CP345 S1
NFAR181-S00 AAI141-S50 SCP451-11
NFDV161-P00 AFV10D-S41211 PW702 S1
NFDV161-P50 ANB10D-421 AFV30D-A41452
AAR145-S50 ANB10D-425 ALE111-S50


Our Competitive Brands

  • - ABB Advant-800xA,Advant OCS,Bailey Infi 90 and Net 90,H&B Freelance 2000,DSQC Robots,IGCT / IGBT
  • - GE General Electric Field Control, Genius I/O, QuickPanel, RX3i PacSystem, Series 90, Series 90, Series VersaMax
  • - Allen Bradley Allen-Bradley SLC500, MicroLogix, CompactLogix, ControlLogix, PLC-5, Panel View,
  • - Bently Nevada 3300 System, 3500 System
  • - Honeywell 7800 Series, FSC, IPC, Mxopen, TDC 2000, TDC 3000, Experion PKS(C200,C300)
  • - Yokogawa Centum CS - Centum VP, Centum XL - micro XL, FA-M3, ProSafe-PLC
  • - Ovation, Foxboro, EPRO, Emerson DeltaV, Fuji, Siemens, HIMA, Prosoft, Invensys Triconex, ICS TRIPLEX, Woodward, Bachmann, Schneider

 

TEL: +86 18030205725     E-MAIL: manskiwong@cambia.cn

Question 1: Is Our Price Competitive?

NEW-GEN collaborates with over 50 countries worldwide. As a leading supplier in China, we can provide significant discounts to customers based on market demand.

Question 2: What Is The Warranty Period?

We offer a standard one-year warranty for all new and original items.

Question 3: What Payment Methods Do We Accept?

We accept 100% T/T (Telegraphic Transfer) before shipping. For items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. If you have an agent in China, please contact us for RMB transfer.

Question 4: What Shipping Methods Do We Use?

We primarily utilize carriers such as FedEx, DHL, UPS, BRE, etc. If you have an account with any of these carriers, you can arrange the shipping yourself. Additionally, we offer free shipping to China freight forwarders.

Question 5: What Is Our Delivery Time?

Typically, delivery takes around 1-3 days after receiving the advance payment. For items with a quoted lead time, delivery will occur as per the specified lead time.

Question 6: How Do We Package The Goods?

Our packaging process involves multiple layers of protection. Initially, the product is placed in its original box, sealed with a label. Then, we add a layer of bubble wrap to safeguard against collisions during transportation. Finally, all products are securely packed in sturdy boxes for further protection.

Question 7: How Can Customers Contact Us And Request A Quote?

Customers can inquire via email, WhatsApp, WeChat, Skype, or any preferred communication platform. Simply reach out to us, and we'll promptly provide a quote tailored to your needs.